Simpson Strong-Tie
Product Code: 78SFLH300063
Model Code: SFLH300/63
Brand: Simpson Strong-Tie
Finish: Pre Galvanised
£13.84 inc VAT ( Priced Each )
Delivery expected in 2/3 days
Efficient Masonry-to-Timber Connection with the SFLH300/63
IMPORTANT NOTE: The hanger height is actually 300mm, it is designed with a 10mm undercut to ensure the joist sits flush with the top of the blockwork.
The Simpson Strong-Tie SFLH300/63 is an innovative, single-piece masonry joist hanger engineered to support timber joists directly from masonry walls. Unlike traditional hangers, the SFLH does not require a course of masonry above the hanger to achieve its published load-bearing values, making it an ideal choice for fast-paced construction environments. The SFLH series is engineered to meet Part L air leakage requirements by supporting joists without penetrating the inner masonry leaf, effectively eliminating the need for additional mortars, mastics, or proprietary joist sealants.
Key Features & Benefits:
Rapid Installation: Allows floor deck construction to proceed just 3 days after the supporting blockwork is laid (compared to the industry-standard 28 days).
Enhanced Energy Efficiency: Designed specifically to help meet air leakage requirements for the Code for Sustainable Homes. By supporting the joist without penetrating the inner blockwork leaf, it eliminates the need for time-consuming mortaring or mastic sealing.
High Performance: Achieves full structural capacity without the weight of additional masonry courses above the flange.
Safety First: Reduces H&S risks by eliminating the need for temporary propping of floor joists during the curing process.
Material Quality: Manufactured from high-grade pre-galvanised mild steel for excellent corrosion resistance and durability.
Air Tightness: Replaces the need for proprietary sealants or "joist socks" because the hanger doesn't penetrate the inner leaf of the cavity wall.

Why choose the SFLH300/63 over standard hangers?
Speed: Most masonry hangers require the mortar to cure for 28 days before loading. The SFLH allows you to install joists and flooring just 3 days after the wall is built.
No "Course Above": It is structurally rated to work without a course of bricks or blocks on top of the flange—perfect for the top of a wall or under a wall plate.
Sustainability: Supports compliance with the Code for Sustainable Homes by reducing thermal bridging and air bypass at the floor-to-wall junction.
No Masonry Above: Important: Unlike standard masonry hangers, the SFLH achieves its full load-bearing capacity without the need for a course of blockwork above the hanger.
Installation Guidance:
Blockwork: Use on blocks with a minimum crushing strength of 3.5N/mm².
Nailing: All holes in the side flanges must be filled with 3.75 x 30mm Square Twist Nails.
Pro Tip: Do not use with mortar that hasn't reached its initial set (wait at least 72 hours).
| A | B | C | D | E | F | t |
| 63mm | 290mm | 75mm | 49.5mm | 103mm | 81mm | 1.5mm |
*Hanger height (B), the hanger is 300mm, with a 10mm undercut, which gives the advertised 290mm height.
Dimensions
H (Hanger Height): 300mm
Joist Height: 290mm
Undercut: 10mm (The distance from the top of the joist to the top of the blockwork flange)
W (Width): 63mm
Our reliable baseline shipping network services core industrial hubs and regional sites across the UK mainland via premium tracked courier freight routes.
Tight project deadlines. Secure premium prioritised material line allocations. Items are picked, palletised, and routed on premium rapid-transit cargo links.
Standard pricing arrays map explicitly to structural mainland UK postal grids. Supplementary transit routing variables, variable lead times, or specialised carrier adjustments apply across high-altitude or outlying maritime zones:
"The Company" refers to Metro Fixings (www.metrofixings.co.uk).
"The Buyer" refers to the corporate entity, firm, partnership, or individual purchasing Goods or Services from the Company.
"Goods" refers to any fixings, fasteners, building chemicals, tools, or other materials supplied by the Company.
"Services" refers to technical support, testing, tool calibration, or equipment hire provided by the Company ("Metro Hire").
"Contract" refers to the legally binding agreement between the Company and the Buyer for the sale and purchase of Goods and Services, incorporating these Terms and Conditions.
All quotations are given, and all orders are accepted by the Company exclusively subject to these Terms and Conditions. They shall override any alternative terms, conditions, or warranties stipulated, incorporated, or referred to by the Buyer, whether in the order form, specifications, or during negotiations.
No variation to these Terms shall be binding unless expressly agreed in writing and signed by an authorised director of the Company.
An order placed by the Buyer constitutes an offer to purchase. No contract comes into existence until the Company issues an official order acknowledgement or dispatches the Goods, whichever occurs first.
The Company maintains an active stock profile of approximately 35,000 product lines. While every effort is made to ensure live website inventory accuracy, the Company reserves the right to amend, substitute, or withdraw products without prior notice if manufacturer specifications alter.
Any technical advice, substrate guidance, load calculations, or specification suggestions provided by the Company (whether via the technical support desk, sales team, or digital platforms) is issued in good faith as a guide. It remains the ultimate responsibility of the Buyer’s structural engineers, site managers, or architects to verify that the Goods meet local building regulations, site compliance, and safety standards before installation.
Unless otherwise agreed in writing, the price of the Goods shall be the Company’s quoted price or, where no price has been quoted, the price listed on the Company’s e-commerce platform at the date of order acceptance.
All prices are exclusive of Value Added Tax (VAT), which shall be due at the prevailing rate, and exclusive of delivery charges unless the order qualifies for free delivery terms.
For Approved Trade Credit Account Holders: Payment is due strictly in accordance with the agreed credit terms, normally within 30 days from the end of the month of invoicing, unless specified otherwise in writing by the Company's finance desk.
For Non-Account Holders: Payment must be cleared in full via an authorised credit/debit card or electronic bank transfer before the Goods are dispatched.
The Company reserves the right to withdraw, suspend, or reduce the limit of any Trade Credit Account Facility at its absolute discretion at any time if the Buyer fails to make payments by the due date or if the Company's credit risk assessment shifts. Interest on overdue invoices shall accrue daily at a rate of 8% per annum above the Bank of England base rate from time to time in force.
Risk of damage to or loss of the Goods shall pass to the Buyer immediately upon delivery to the specified site address or upon collection from the Company's trade counter.
Notwithstanding delivery and the passing of risk, property and legal title in the Goods shall not pass to the Buyer until the Company has received payment in full (in cleared funds) for those Goods and all other sums which are or which become due to the Company from the Buyer on any account.
Until title passes, the Buyer must store the Goods safely, preserve their original packaging, and clearly identify them as the Company’s property. The Company reserves the irrevocable right to enter any site or premises occupied by the Buyer to inspect or repossess the Goods if payment terms are breached.
The Company operates its own transport delivery fleet alongside premier national express carrier networks (such as DPD). Delivery dates and windows are estimates only, and time of delivery shall not be of the essence of the Contract.
Orders over £100 net (exclusive of VAT) qualify for free delivery within standard mainland UK zones. Orders under this threshold, or deliveries destined for international locations or high-tariff zones, will incur a transport surcharge.
The Company shall not be liable for any direct, indirect, or consequential loss, cost, damages, or site penalties (including liquidated damages or main contractor delays) caused directly or indirectly by a delay in delivery or a failure to deliver due to circumstances beyond its reasonable control ("Force Majeure").
The Buyer must provide safe, unobstructed access and adequate offloading facilities at the designated site delivery address.
The Buyer must inspect the Goods immediately upon arrival. Any claim for shortages, visible transit damage, or incorrect product supply must be notified to the Company's Customer Care team in writing within three (3) working days of delivery. Failure to notify within this timeframe shall constitute absolute acceptance of the shipment.
The Company offers a 30-day return policy for standard, unused, un-opened, resaleable stock items in their original packaging.
Bespoke fabrications, non-stock items ordered specialised to client specifications, and perishable building chemicals (such as expired or temperature-sensitive vinylester resins) are strictly non-returnable and non-refundable unless verified as defective by the manufacturer.
Where a defect is validated under the manufacturer's warranty, the Company’s liability shall be limited entirely, at its sole discretion, to replacing the defective Goods or issuing a credit note for the invoice value.
All machinery, power tools, testing gauges, and safety systems supplied under the Metro Hire banner remain the sole property of the Company.
The Hire Period commences when the equipment leaves the Company’s depot and terminates when a formal off-hire confirmation is issued or the equipment is safely returned to the Company’s custody.
The Buyer is strictly responsible for ensuring that all hired equipment is operated exclusively by fully trained, qualified personnel in accordance with HSE guidelines and manufacturer operating manuals.
The Buyer must maintain comprehensive insurance covering the full replacement value of the hired equipment against theft, loss, or accidental damage throughout the duration of the hire period. Any equipment returned damaged, uncleaned, or missing components will be subject to direct repair or replacement charges billed to the Buyer's account.
Nothing in these Terms shall limit or exclude the Company’s liability for death or personal injury caused by its negligence, or for fraud or fraudulent misrepresentation.
Subject to the above clause, the Company shall under no circumstances whatsoever be liable to the Buyer, whether in contract, tort (including negligence), breach of statutory duty, or otherwise, for any loss of profit, loss of revenue, loss of business opportunity, site delay costs, or any indirect or consequential loss arising under or in connection with the Contract.
The Company's total cumulative liability to the Buyer in respect of all other losses arising under or in connection with the Contract shall be limited strictly to the net invoice value of the specific Goods or Services that gave rise to the claim.
The Contract, and any dispute or claim arising out of or in connection with it or its subject matter or formation (including non-contractual disputes or claims), shall be governed by, and construed in accordance with, the laws of England and Wales.
The Company and the Buyer irrevocably agree that the courts of England and Wales shall have exclusive jurisdiction to settle any dispute or claim arising out of or in connection with the Contract.